Missouri Safe and Sound 554

Project consisted of the demolition, design and rebuild of 554 Bridges in Missouri, USA over a course of 2 years. Total project costs were around $490Mil. There was a bridge replacement in each county and the logistics and moving parts made this job one of the most challenging. At its peak there were 60 bridges being constructed at one time. There was enough precast bridge beams set to reach across the state end to end. Delivered 1.2 yrs early.